This allows all VMs to be used at the end of a test sequence by
assigning test cases to VMs based on which VM is available for a new
test case rather than splitting the full task at the beginning and
potentially getting stuck with the last VM running long test cases for
significantly longer than another VM that gets shorter duration tests
assigned to it.
Signed-off-by: Jouni Malinen <j@w1.fi>
Previously, it was possible for a kernel panic to be missed since the
only sign of it in stdout was reduced number of passed test cases.
Signed-off-by: Jouni Malinen <j@w1.fi>
This avoids possible mismatches in directory and log file timestamps if
the UNIX timestamp (seconds) changes during the startup sequence.
Signed-off-by: Jouni Malinen <j@w1.fi>
This is a more advanced version of the simple parallel-vm.sh script.
Status of each VM is printed out during the test and results are
provided in more convenient format in the end.
Signed-off-by: Jouni Malinen <j@w1.fi>