Commit graph

5 commits

Author SHA1 Message Date
John Crispin
2fde3caa3a HE: Properly populate Beacon template prior to sending it to the kernel
Properly populate the the HE Capabilities element with the info read
from the kernel.

Signed-off-by: Shashidhar Lakkavalli <slakkavalli@datto.com>
Signed-off-by: John Crispin <john@phrozen.org>
2019-04-25 12:00:51 +03:00
John Crispin
7cac255632 HE: Fix Operation Parameters order
According to P802.11ax/D4.0 9.4.2.238 (HE Operation element) the BSS
Color Information field is located after the HE Operation Parameters
field. Fix the ordering of the bit masks/offsets for fields in these 3+1
octets used as a single 32-bit value. With these changes, Wireshark 3.2
is able to properly parse and display Beacon frames.

Signed-off-by: Shashidhar Lakkavalli <slakkavalli@datto.com>
Signed-off-by: John Crispin <john@phrozen.org>
2019-04-25 11:55:39 +03:00
Siva Mullati
11ce7a1bc3 HE: Add MU EDCA Parameter Set element (AP)
Add support for configuring parameters for the MU EDCA Parameter Set
element per IEEE P802.11ax/D3.0.

Signed-off-by: Siva Mullati <siva.mullati@intel.com>
2019-01-08 17:22:43 +02:00
Peng Xu
4a37463416 hostapd: Update HE capabilities and HE operation definition
Replace vendor-specific elements for HE capabilities and HE operation
elements with the P802.11ax defined element values. This version is
based on P802.11ax/D1.4.

Signed-off-by: Jouni Malinen <jouni@qca.qualcomm.com>
2017-10-05 15:09:43 +03:00
Peng Xu
d512f406fc hostapd: Add IEEE 802.11ax HE IEs into Beacon/Probe Response frames
IEEE 802.11ax HE changes to include HE IEs in Beacon and Probe Response
frames. These elements are using vendor specific forms for now since the
IEEE 802.11ax draft is not yet finalized and the element contents is
subject to change.

Signed-off-by: Jouni Malinen <jouni@qca.qualcomm.com>
2017-02-19 17:37:55 +02:00